Loose Stones
Loose Stones B2B: What a Report Proves and What It Does Not
What a Report Proves and What It Does Not
A US setters, repair benches and jewelry manufacturers came to us after 420 loose Stones from a trading company produced 11 rejects in the first inspection. The defect was not cosmetic: sieve drift had drifted far enough that the buyer's own bench could not correct it without recutting.
That rejection was avoidable at the drawing stage. sieve drift belongs on the spec sheet next to the stone size, not in the claim email three weeks after arrival. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
Our rebuild kept the buyer's retail price and changed four numbers on the bench. The next run cleared inspection because the specification traveled with the tray, not with a phone call. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
What American buyers Check Before They Sign
Most quotes describe the loose Stone and skip the part that determines the buyer's margin. Those four lines are listed below with the trade default beside our standard. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
| Spec point | Common trade output | HOLYCOME standard | Cost if missed |
|---|---|---|---|
| Sieve Drift on loose Stones | Inspected visually at the tray | Gauntlet check on every piece, limit written in the spec | Returns inside 60 days of wear |
| Mixed Color Lots on loose Stones | Batch dependent, not logged | Thickness and tension logged per lot | Complaint after the second season |
| Girdle Damage on loose Stones | Estimated from nominal | Gauged per size with go/no-go tools | Resize queue and reship cost |
| Tolerance stack-up on loose Stones | Quote states nominal only | Worst-case band published per SKU | Freight and duty drift |
Write these four into the purchase order and the argument after delivery becomes arithmetic rather than recollection. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
Where USD 3-95 Per Piece Actually Goes
Buyers assume the stone dominates the cost of a loose Stone. At wholesale it is closer to a quarter, and the labor line is where two quotes for the same drawing diverge by double digits. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
| Cost line | Share | What moves it |
|---|---|---|
| Base metal or alloy for loose Stones | 32% | Alloy choice and casting yield |
| Stone or melee for loose Stones | 23% | Sieve range and lot batching |
| Setting and finishing labor for loose Stones | 21% | Jig design and bench minutes |
| Plating, polish and QC for loose Stones | 14% | Per-tray versus per-piece checks |
| Packaging and freight for loose Stones | 10% | Box grade and DDP versus FOB |
The cheapest quote for loose Stones usually hides its saving in the plating line and the stone grade. Both show up in the second season, not the first. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
The Three Failures We See Most in Incoming Samples
sieve drift
A parcel sold as 2.0-2.2 mm with 15% of stones at 1.9 mm changes the setting labor on the buyer's bench. Sieve the parcel, do not sample it.
The commercial effect is replacement stones plus a sorting delay on the buyer's line. Buyers who have seen it once put it in the purchase order; buyers who have not usually discover it on the first return.
mixed color lots
Mixing near-colorless and G-H stones in one parcel produces a finished piece with a visible tonal step. Parcels ship by single lot.
Our countermeasure is a gauge and a written limit. It adds about 6 seconds per piece and removes the defect from the run rather than from the carton.
girdle damage
Stones packed loose in a bag chip each other in transit. Individually wrapped parcels cost more and arrive usable.
In a 420-piece run this typically shows on 17 of pieces. Catching it means measuring size distribution within the declared sieve at the tray level, not inspecting the finished carton.
What a Report Proves and What It Does Not
The short version for loose Stones: it is arithmetic, not relationship. The long version is below.
One practical note on timing for loose stones: the calendar starts when the spec is signed, not when the deposit clears. A buyer who signs in week one and pays in week three gets the goods in week five.
We date the loose Stones proforma from signature for that reason, and we state the deposit deadline in the same email that carries the spec sheet.
How a Repeat Order Gets Built
The calendar below is what we quote on a 420-piece run of loose Stones. It starts when the spec is signed, not when the deposit clears. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
- Spec sheet signed before casting: calibrated sizes from 1.5 mm to 12 mm, tolerances, plating thickness and packing format.
- Sample in 3-5 working days from stock components, or about 20 days if a new model is required.
- Production photos at three checkpoints: raw cast, post-polish, post-set, with buyer approval at each.
- Bulk in 15-20 days under 500 pieces; custom tooling runs 25-30 days.
- Pre-shipment QC report with per-tray counts and a retained reference tray for disputes.
MOQ is 50 pieces per design, low enough to test a category and high enough to keep the casting line accountable. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
What a Report Proves and What It Does Not
Buyers in US e-commerce tend to over-index on unit price for loose Stones and under-index on what happens after delivery.
There is a version of this that looks cheaper on paper and costs more in practice: quoting the best case on loose stones and letting the buyer discover the spread. It works once. The second order goes to whichever supplier quoted honestly.
We would rather lose a first order of loose stones on price than explain a defect after it lands. That position is unusual in this category and it is the reason our reorder share is high.
How the Second Order Becomes Cheaper
Most loose Stones disputes we arbitrate trace back to this line, not to the defect itself.
We run this check per tray rather than per carton because the defect that matters on loose stones is the one that repeats. A single odd piece is noise; a pattern across one tray is a process problem and it will be in every tray made after it.
The report the buyer receives states the count per tray, the measured average and the outlier count for loose Stones. It is deliberately unglamorous, and it is the document that settles most disputes before they start.
The Reject Tray Policy That Decides a Partnership
For loose Stones at this price band, the honest answer is a range rather than a point, and the range has a reason.
One practical note on timing for loose stones: the calendar starts when the spec is signed, not when the deposit clears. A buyer who signs in week one and pays in week three gets the goods in week five.
We date the loose Stones proforma from signature for that reason, and we state the deposit deadline in the same email that carries the spec sheet.
What This Means for a First Order
The point of a small first run is not the margin. It is finding out whether the supplier's paperwork survives contact with the actual goods. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
The first order is the cheapest inspection a buyer will ever run, because the volume is small enough to check every tray by hand. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
Freight, Duty and the Arrival Check
Sea freight costs roughly a third of air and takes three times the transit, which only makes sense for an SKU already selling in US e-commerce. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
FOB is the default and DDP is the option. Buyers new to US e-commerce usually take DDP once and then switch after they see the breakdown. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
The arrival check is three steps: count cartons against the packing list, weigh a sample tray, and measure ten pieces against size distribution within the declared sieve and zero girdle chips on arrival. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
Frequently Asked Questions
What is the minimum order for loose Stones?
50 pieces per loose Stone. Designs mix inside one shipment, so a first order of three designs at 50 pieces each is normal for a new US account. Below 50 we cannot keep the gauge check independent of the shift, which is the part buyers actually pay for on loose Stones.
How long does a reorder of the same loose Stone take?
12-15 days for loose Stones, because the model, the gauge set and the signed spec stay in our system. A first run is longer: 3-5 days for a stock-component sample, about 20 days if a new model is needed, then 15-20 days for bulk under 500 pieces.
Do you supply certificates for loose Stones?
GRA or IGI per stone above 0.50 ct for loose Stones. Below that threshold we supply a batch report plus per-piece measurement of size distribution within the declared sieve, which is what most resellers need at the counter.
What finish do you use on loose Stones, and how thick is it?
Rhodium at 0.20 micron minimum on white loose Stones, with a palladium strike layer so wear-through reads white rather than yellow. Thickness is logged per lot and appears on the QC sheet, not only in the brochure.
How do you handle a rejected tray of loose Stones?
We replace or credit inside the same order cycle. The retained reference tray decides: if sieve drift shows on our retained loose Stone we own it, and if it appeared in transit we split the assay cost and file with the carrier. A typical exposure on loose Stones is replacement stones plus a sorting delay on the buyer's line.
Next Step
Send one drawing or one competitor sample with your target landed cost. We answer with a tolerance sheet, a cost breakdown and a production calendar in two business days. For loose Stones in this band the rule is the same on every tray of the run, not only on the first.
HOLYCOME runs this line from Wuzhou, Guangxi, through Wuzhou HengliLai Jewelry Co., Ltd. Output is about 60,000 pieces a month across loose Stones and adjacent categories. service@holycome.com or WhatsApp +86 133 7744 7107.
Related reading: Engagement Rings B2B: What the Quote Actually Covers - HOLYCOME Necklaces & Pendants B2B: AQL, Tray Checks and What a QC Report Should Say - HOLYCOME
Send your spec sheet — stone, cut, size, plating and quantity — and we will return a costed timeline.
Ask the workshop

