Loose Stones
Loose Stones Factory Direct: production lead time calendar
Overview of Production Lead Time
The first step in our process is a rigorous incoming stone inspection. We accept every loose stone from suppliers, but those that fail the initial quality check are rejected before polishing. This gives us a clean slate and keeps the production line running smoothly.
Once a stone passes inspection, it goes straight to our in‑process check. During polishing we monitor cut depth, clarity, and color. Stones that don't meet the specifications are re‑polished or, if necessary, excluded from the batch. This double‑check keeps the final yield high and reduces rework.
Three‑Stage QC Explained
Our first quality control stage focuses on the raw stone’s physical condition—no chips, no fractures. The second stage assesses the polishing outcome against GRA/IGI standards. The final check is an AQL audit before shipment, ensuring every stone meets the exact order parameters.
Because we own the setting and polishing lines, we can implement these checks in real time, which saves time and guarantees higher first‑pass yield than typical trading companies.
Lead Time Calendar and Planning
After the QC stages, the stone moves to the setting phase. We schedule 12‑18 days from receipt of the first stone to arrival at the customer. This window includes polishing, setting, and final QC, providing a predictable calendar for buyers.
For custom orders, the MOQ is 30 pieces, but the lead time remains the same. We can start polishing as soon as the deposit is in place, with no additional delays for personalization.
| Stage | Duration | Key Activity | Quality Focus |
|---|---|---|---|
| Incoming Check | 1–2 days | Stone inspection | Physical integrity |
| Polishing | 5–7 days | Cutting and polishing | Facet precision |
| Final QC & Packaging | 2–3 days | AQL audit | Certification compliance |
Cost, Speed, and Yield Benefits
Our first‑pass yield is around 20% higher than typical trading companies. This means fewer stones are rejected, which translates to lower overall costs for you. With a 30% T/T deposit, we secure your order and lock in pricing before production starts.
For samples and low‑volume orders, we accept PayPal on a 1‑piece basis. Once the deposit is confirmed, we proceed with the 12‑18 day lead time from raw stone to delivery.
Delivery and Logistics
- DDP delivery to the U.S. takes 5–8 days.
- DDP delivery to the EU takes 7–10 days.
- Tracking is included with every shipment.
- We manage customs clearance on your behalf.
- WhatsApp support is available at +86 133 7744 7107.
Partnering with Holycome
When you choose our loose stones, you get direct access to the factory. There are no middle‑men, meaning faster turnaround and more competitive pricing. The MOQ for stock stones is one piece, making it easy for small businesses to test our quality.
For custom designs, we offer 30 pieces as the minimum order, with flexible payment options and fast production. The entire process is transparent, and we keep you updated at each QC stage.
Frequently Asked Questions
What is the minimum order quantity for custom loose stones?
The MOQ for custom orders is 30 pieces. For stock stones, the minimum is just one piece, which is ideal for sampling or small projects.
How long does the lead time take from deposit to delivery?
From the moment the 30% T/T deposit is received, the production lead time is 12–18 days. Delivery to the U.S. is 5–8 days on DDP terms.
Can I get GRA or IGI certificates for my order?
Yes, all stones are certified with GRA or IGI certificates. We include the certificates in the final package and provide electronic copies upon request.
Ready to get your own pieces from our factory? Contact us for a quote or sample today.
Send your spec sheet — stone, cut, size, plating and quantity — and we will return a costed timeline.
Ask the workshop

