Bridal Sets
Bridal Sets Wholesale: Landed Cost Math for a First Order
The number on the quote is not the number you pay
Twelve years on the floor, and I still get the same email: buyer gets a unit price for bridal sets wholesale, multiplies it by quantity, and calls that the budget. Then the invoice lands and it is 25 to 40 percent heavier. Nothing shady happened. The quote was FOB, and FOB only covers the goods sitting at my dock.
So let me walk you through a first order the way I would if you were standing next to my QC bench, with the boxes open and the scale on the table.
Start with what actually goes into one set
A bridal set is not one item. It is an engagement ring plus a band, sometimes a third piece, and the stone grade drives most of the spread. Two sets can look identical in a photo and differ by 300 percent in cost.
Here is roughly how the money splits on a 925 silver set with moissanite, built to a mid-grade spec.
- Stones: 30 to 45 percent of unit cost, depending on carat total weight and grade
- Metal and casting: 20 to 28 percent, mostly silver weight plus labor
- Setting and hand finishing: 15 to 20 percent, prong work and polish
- Plating, rhodium or gold tone: 5 to 8 percent
- Certificates, packaging, inner boxes: 4 to 8 percent
Lab-grown diamond sets push the stone line up hard. That is not a markup trick, it is the rough price. What you control is grade discipline: if your customer will not see a difference, do not pay for VS when SI1 reads clean at arm's length.
The landed cost build, line by line
Landed cost means the set is on your shelf, duty paid, ready to sell. I build it in five blocks.
Block one: goods value
Your FOB unit price times quantity. Ask for it broken out by SKU, not blended, because a blended price hides the fact that one style is carrying the margin of another.
Block two: freight
Air express is the norm for first orders. Small parcels clear in 5 to 8 days door to door on DDP terms, which means we handle the customs entry and you get a delivered price. Sea freight only makes sense once you are past a few hundred kilos, and bridal sets are light.
Block three: duty and tax
US buyers should check the current HTS line and any Section 301 treatment for their specific composition. EU buyers deal with VAT at import plus the code for silver or base metal jewelry. Do not guess this. Ask your broker for the rate before you sign a PO, because a two-point swing on duty eats a whole promotional margin.
Block four: compliance and certificates
GRA cards for the moissanite, IGI reports where the order calls for lab-grown. Nickel release testing matters in the EU. Budget this per unit, not per shipment.
Block five: the soft costs nobody quotes
Payment fees, sample cost you never recover, and the rework you did not plan for. These are where first orders bleed.
A worked example on 200 sets
Round numbers, silver moissanite bridal sets, mid grade, delivered DDP to a US warehouse.
| Cost line | Basis | Per unit | 200 units |
|---|---|---|---|
| Goods, FOB | Quoted unit price | 38.00 | 7,600 |
| Freight, DDP air | 5 to 8 day service | 2.40 | 480 |
| Duty and entry | Rate per broker | 2.10 | 420 |
| Certificates and packaging | GRA card, box, pouch | 1.30 | 260 |
| Payment and FX fees | Approx 1.5 percent | 0.60 | 120 |
| Landed total | 44.40 | 8,880 |
Notice the gap between 38 and 44.40. That is 17 percent, and on a first order with a small quantity the freight line balloons because you are paying for a parcel, not a pallet. Order 500 and that same freight line might fall to 1.40 a unit.
Buyers who ask for a DDP quote up front make better decisions than buyers who chase the lowest FOB number. The lowest FOB number is usually just the one with the most cost still hiding behind it.
Where a factory beats a trading company on the math
This is the part you should grill every supplier on. Our cost, speed, and yield run about 20 percent better than typical trading companies, and the reason is boring: we cut and set the stones and cast the metal in the same building. No middle layer taking a slice, no second QC pass, no shipping between vendors.
Practically, that shows up in three places on your invoice. Stone cost is lower because we buy rough and sort in-house. Lead time is 12 to 18 days for production instead of a month of handoffs. And yield is higher because our three-stage QC catches problems before they become scrap.
That QC is incoming stone check on arrival at the bench, in-process inspection during setting and polish, and a pre-ship AQL sample pull against your spec sheet. Ask any supplier to describe their AQL level and sample size. Vague answers are a warning.
Payment terms and how they hit your cash flow
Standard is T/T with 30 percent deposit and the balance against the pre-shipment inspection report. PayPal works for samples and small trial orders, which is useful when your finance team wants a paper trail before a wire.
Do the cash math on your first order, not just the unit cost. Deposit leaves on day one, balance leaves around day 15, goods land around day 20. If your retail cycle is 45 days, you are carrying that inventory for most of a quarter.
MOQ reality for a first order
Stock styles ship from one piece. Custom design, your own sizing curve and stone spec, runs 30 pieces per style. Most first-time buyers should do a hybrid: 30 to 50 pieces of stock to test the market, then one or two custom styles once you know what sells.
Do not spread a first order across twelve styles at four pieces each. You will pay setup on every one and learn nothing statistically.
Frequently Asked Questions
What is the minimum order for bridal sets wholesale?
One piece per style for stock designs, and 30 pieces per style for custom work with your own spec. Mixed containers are fine on stock as long as each SKU meets its own minimum.
How long does a first order take?
Production runs 12 to 18 days after deposit and spec sign-off, then 5 to 8 days DDP delivery. Add a week if you are waiting on IGI reports for lab-grown stones.
How is the price calculated?
Price is built from stone grade and carat weight, metal weight, setting complexity, and plating, then quoted FOB or DDP per unit. Always ask which basis you are being quoted on before comparing suppliers.
Get your numbers before you commit
Send me your target retail price, your stone preference, and the quantity you are considering, and I will send back a line-by-line landed cost with freight and duty included so you can see the real number. If you want to hold the product first, we can ship samples by PayPal and you can put the set under a loupe before any deposit moves. Reach the team at service@holycome.com or WhatsApp +86 133 7744 7107.
Send your spec sheet — stone, cut, size, plating and quantity — and we will return a costed timeline.
Ask the workshop



